TRC Contracts has been working closely with Amber Construction Services across 45 occupied homes at Bramley House in Notting Dale, North Kensington, after being appointed to design, manufacture and install 260 replacement triple-glazed timber sash windows at the site.

Funded through SHDF (now WH:SHF), the project has been delivered in line with PAS 2035 requirements to modernise the building, improve comfort, and significantly enhance thermal performance.

Bramley House will be the first of our Council-managed homes to be completely re-fitted with triple-glazed windows. This type of window helps keep the heat in and reduces sound from outside.
Services provided
TRC Contracts has been working closely with Amber Construction Services across 45 occupied homes at Bramley House in Notting Dale, North Kensington, after being appointed to design, manufacture and install 260 replacement triple-glazed timber sash windows at the site.

Funded through SHDF (now WH:SHF), the project has been delivered in line with PAS 2035 requirements to modernise the building, improve comfort, and significantly enhance thermal performance.

Bramley House will be the first of our Council-managed homes to be completely re-fitted with triple-glazed windows. This type of window helps keep the heat in and reduces sound from outside.

Bramley House is a residential building undergoing significant refurbishment to enhance its energy efficiency and aesthetic appeal. The project focuses on replacing the existing windows and doors with high-performance triple-glazed timber sash units, improving thermal insulation and contributing to the building’s sustainability. As a fully occupied complex, the works were carefully coordinated to minimise disruption to residents, while ensuring the preservation of the building’s historic charm and meeting the required energy performance standards for funding compliance.

A close-up, angled view of a white multi-paned sash window on a brick building's exterior balcony. A black window box filled with vibrant green and white spider plants sits on the white sill. The brickwork shows a distinct horizontal shadow line, with darker bricks above and brighter orange-red bricks below. A red door is visible further down the walkway.

The project

The installation of the windows and doors at Bramley House required a Trustmark & PAS2030 certified installer, with all work carried out in full compliance with PAS 2030 standards to secure the necessary funding. Given that the flats remained fully occupied throughout the project, TRC had to ensure that the replacement of the windows and doors was conducted with minimal disruption to residents. The windows and doors were specified to be triple-glazed, unless otherwise noted, with certain areas requiring double-glazed fire-rated glazing units. Additionally, the triple glazing was required to meet a minimum U-value rating of 0.7 W/(m2K) to ensure optimal energy efficiency.

Main Contractor Amber Construction Services LTD
Project Value £485k
Contract Duration 6 months
Contract Type Sub-contract

TRC Contracts’ Triple Glazed Box Sash Windows

TRC Contracts provided bespoke triple-glazed box sash windows for the Bramley House project, offering exceptional thermal and energy performance. TRC’s triple-glazed sash windows are specifically designed to meet the highest standards of energy efficiency, achieving impressive U-values that ensure improved insulation and reduced heat loss. These high-performance windows contribute significantly to the building’s overall sustainability while maintaining the aesthetic appeal of traditional sash windows. By incorporating triple glazing, TRC Contracts delivered a solution that not only enhanced the building’s energy efficiency but also helped to meet the rigorous specifications set for the project, ensuring long-term comfort for residents and compliance with funding requirements.

Inside the Bramley House refurbishment

Watch the video to see the completed refurbishment works at Bramley House in North Kensington, where TRC Contracts supplied and installed triple-glazed windows throughout the block. A landmark moment in the wider £600 million council-managed programme, Bramley House became the first council-managed residential block to be fully fitted with triple-glazed windows, delivering meaningful improvements in noise reduction, thermal comfort and overall quality of life for residents.

The results speak for themselves. Residents have expressed real satisfaction with the transformation, describing a quieter, safer and more modern living environment.

More case studies

All case studies

Get in touch

Get in touch

Get in touch

x
Close

Fill in form to download

Product Selector Window Restoration Company Brochure