Get in touch

Get in touch

Get in touch

Thanks for getting in touch.
We'll get back to you shortly.

Need an urgent response?

Case Study

Victoria Building – Blackburn College

Blackburn
TRC Contracts were appointed by BAM Construction to carry out the specialist refurbishment and upgrade of the original sash and casement windows at the Grade II listed Victoria Building at Blackburn College, delivering a cost-effective and sensitive restoration that preserved the building’s historic character.
Services provided
TRC Contracts were appointed by BAM Construction to carry out the specialist refurbishment and upgrade of the original sash and casement windows at the Grade II listed Victoria Building at Blackburn College, delivering a cost-effective and sensitive restoration that preserved the building’s historic character.

The Victoria Building, completed in 1888, stands as a prominent symbol of Blackburn’s industrial heritage and civic pride. Originally conceived through an architectural competition, the building was constructed as a Technical College, funded by philanthropic donations and public subscription to mark Queen Victoria’s Golden Jubilee.

Its ornate façade and intricate stained-glass windows showcase themes of science, technology, the arts, and manufacturing – reflecting the town’s industrial achievements during the late 19th century. Recognised for its architectural and historical significance, the building was granted Grade II listed status in March 1984, ensuring its preservation as a valued landmark within the Blackburn College campus.

Victoria Building - Blackburn College

The project

TRC Contracts were tasked with the sensitive refurbishment and upgrade of the building’s original sash and casement windows, ensuring the preservation of the Victoria Building’s historic character. Working within the constraints of its Grade II listed status, TRC delivered a cost-effective and efficient solution that balanced restoration with performance improvements.

The scope of work included the installation of concealed draughtproofing, replacement of glazing, timber repairs, and renewal of ironmongery. Throughout the project, great care was taken to retain and conserve as much of the original window features as possible, in keeping with the building’s heritage and architectural integrity.

Client BAM Construction
Project duration 20 weeks
Building type College
Listing Grade 2 Listed

Blending tradition with performance through heritage window solutions

TRC Contracts’ heritage sash and casement windows played a vital role in the successful restoration of the Victoria Building. Designed to meet the demands of listed and conservation properties, TRC’s sash windows combine traditional aesthetics with modern performance, featuring slim sightlines and concealed technology to improve energy efficiency without compromising on authenticity.

Similarly, our heritage casement windows offer a timeless design with the option for bespoke detailing, making them ideal for matching original window styles. On this project, TRC’s expertise and precision-engineered products enabled the careful refurbishment of existing windows, blending seamlessly with the building’s historic fabric while enhancing comfort, functionality, and longevity.

More case studies

All case studies

Get in touch

Get in touch

Get in touch

x
Close

Fill in form to download